Buying Conservation District land can be tempting. These properties are often private, beautiful, and located in some of the most dramatic parts of the Hāmākua Coast.
But Conservation land is not simply another form of rural zoning. The State of Hawaiʻi regulates what you can do with the land, and even a use that appears to be allowed may require extensive review and approval.
This article provides an overview of what buyers should understand before purchasing Conservation land with plans to build. Although the examples focus on the Hāmākua Coast and East Hawaiʻi, the same State Conservation District rules generally apply throughout Hawaiʻi.
The most important point: Never assume that a parcel is buildable simply because it is privately owned, has road access, or contains neighboring homes.
The State and County Have Different Roles
Land within the State Conservation District is primarily regulated by the Hawaiʻi Department of Land and Natural Resources through its Office of Conservation and Coastal Lands, commonly called OCCL.
OCCL and the Board of Land and Natural Resources determine whether a proposed land use is allowable and what conditions must be met. This can include the location, size, design, grading, landscaping, and environmental impacts of a home.
State Conservation approval does not replace the other approvals that may be required. Depending on the property and project, you may also need:
- Hawaiʻi County building permits
- Grading, grubbing, or stockpiling permits
- A Special Management Area determination or permit
- Shoreline certification and shoreline setback review
- Department of Health approval for a septic or other individual wastewater system
- Additional State or federal approvals involving streams, wetlands, historic sites, or protected species
In practical terms: DLNR approval does not mean you are ready to build. It means you can move forward with the additional plans and permits required for construction.
The Conservation Subzone Matters
Conservation District land is divided into five subzones. The subzone determines which land uses may be considered and what level of approval is required.
| Subzone | General Purpose | Residential Outlook |
|---|---|---|
| Protective | Protects especially valuable natural and cultural resources. | An ordinary new single-family residence is generally not an identified use. Limited exceptions may apply to kuleana land or certain existing nonconforming residences. |
| Limited | Restricts activity where natural conditions create significant limitations. | Residential use is narrowly defined and requires careful review. Do not assume a home can be approved without direct OCCL confirmation. |
| Resource | Allows managed use of natural resources. | A single-family residence is an identified use, but it requires a Conservation District Use Permit approved by the Board of Land and Natural Resources. |
| General | Includes land with fewer conservation constraints and, in some cases, land suitable for agriculture or similar uses. | Uses allowed in the Resource Subzone may also be considered, but approval remains conditional. |
| Special | Applies to specifically designated areas with unique development and conservation objectives. | Permitted uses depend on the particular Special Subzone designation. |
You can use the State’s Conservation District Subzones map for an initial review. However, a GIS map should not be your final determination. Boundaries can be difficult to interpret, especially when only part of a parcel is within the Conservation District.
Why Hāmākua Coast Properties Can Be Particularly Complicated
The Hāmākua Coast combines steep terrain, deep gulches, streams, coastal cliffs, heavy rainfall, historic plantation lands, and significant cultural and environmental resources. All of that can affect whether and where a home can be built.
Issues that commonly require closer review include:
- Steep terrain and unstable slopes: A project may require geotechnical analysis, engineered foundations, drainage planning, and extensive grading review.
- Streams and gulches: Access roads, bridges, culverts, and building sites near waterways can trigger additional State or federal requirements.
- Shoreline hazards: Coastal erosion, wave exposure, flooding, and shoreline setbacks may substantially limit the usable portion of a parcel.
- Historic and cultural resources: Archaeological studies or consultation may be required before land disturbance is approved.
- Protected plants and animals: A biological survey and mitigation plan may be required.
- Limited infrastructure: Some properties have no County water, electrical service, or practical wastewater solution. Solar, catchment, and an engineered wastewater system may be necessary.
- Legal access: A road shown on a map does not necessarily provide legal, physical, or buildable access to the proposed homesite.
The Basic Approval Process
The process varies by property, subzone, and proposed use, but a buyer planning to build should expect something similar to the following.
1. Confirm the parcel, district, and subzone
Confirm that the parcel is a legal lot of record, determine how much of it lies within the Conservation District, identify the applicable subzone, and investigate any existing permits or unresolved violations.
2. Define exactly what you want to build
OCCL cannot evaluate a general idea such as “I want to build a small house someday.” The proposed use, location, size, access, utilities, grading, wastewater system, and site disturbance all matter.
3. Determine the required level of approval
Conservation District uses fall into different approval categories. A small project may require a Site Plan Approval, while other uses require a Departmental or Board Conservation District Use Permit.
Under the current rules, a new single-family residence in the Resource Subzone requires a Board permit.
4. Complete the necessary studies
Depending on the project, the application may require an Environmental Assessment, an Environmental Impact Statement, or documentation supporting an exemption. Archaeological, cultural, biological, shoreline, drainage, geotechnical, and other technical work may also be required.
Not every property needs every study. The required work depends on the land, proposed use, and agencies involved.
5. Submit the Conservation District application
A complete application must include detailed plans and supporting documentation. OCCL can reject an incomplete application or require additional information before accepting it for processing.
6. Obtain the State decision
Depending on the permit category, the decision may be made by the DLNR Chairperson or the Board of Land and Natural Resources. Approval may include extensive conditions governing construction, landscaping, access, environmental protection, reporting, and future use.
7. Complete construction plans and obtain the remaining permits
After Conservation approval, detailed construction plans may need to be submitted to OCCL. The owner must then complete the applicable County, Department of Health, shoreline, and other agency permitting processes before work begins.
How Long Does It Take?
There is no reliable one-size-fits-all timeline.
Under the current rules, the State generally has a 180-day decision period after a completed Conservation District application is formally accepted. That clock does not begin when the application is first delivered. It begins only after OCCL determines that the application is complete and accepts it for processing.
Work completed before acceptance, including site planning, environmental review, engineering, consultant studies, and responses to agency questions, can add substantial time. County and Department of Health approvals come with their own timelines.
For planning purposes: One to two years is not an unreasonable starting assumption for a complicated residential project, but some properties may take considerably longer. Approval is never guaranteed.
What Does the Planning and Permitting Cost?
The State application fee is usually one of the smaller costs.
| Application Type | Current OCCL Fee |
|---|---|
| Site Plan Approval | $50 |
| Departmental Permit | $250 |
| Board Permit | 2.5% of project cost, with a $250 minimum and $2,500 maximum |
Public-hearing and publication expenses may also apply. More importantly, the owner may need to pay for some combination of:
- Architectural and site plans
- Civil and structural engineering
- Surveying and boundary work
- Geotechnical or slope analysis
- Environmental documentation
- Archaeological or cultural studies
- Biological surveys
- Shoreline or erosion studies
- Wastewater engineering
- County and Department of Health fees
On a complicated property, spending tens of thousands of dollars before construction begins is entirely possible. The actual cost should be based on the specific site and written estimates from the professionals who will perform the work.
Important Restrictions Buyers Often Miss
Only one residence may be allowed
The current rules state that no more than one single-family residence may be authorized within the Conservation District on a legal lot of record.
A Conservation District residence also cannot be approved when another residence already exists on a different portion of the same legal lot within a State Residential, Rural, or Agricultural District.
That makes future plans for a guest house, second dwelling, rental unit, or family compound especially problematic.
Transient rentals are prohibited
Conservation District rules prohibit transient rentals, which the rules define as compensated stays of fewer than 180 consecutive days. A single-family residence also cannot be used for rental or another commercial purpose unless approved by the Board.
This is separate from Hawaiʻi County’s short-term-rental rules. Receiving County approval would not override a State Conservation District restriction.
The home must meet Conservation District design standards
The State rules address matters such as maximum developed area, height, setbacks, grading, landscaping, and shoreline hazards. The amount of land you own does not necessarily determine how large a home you can build.
Approval comes with deadlines
Conservation District permits normally include deadlines to begin and complete work. Extensions may be possible, but they require approval. A permit can lapse or be revoked if its conditions are not followed.
Real Examples from Hawaiʻi Island
These cases show why buyers should investigate Conservation District requirements before purchasing, building, expanding, or renting a property.
Goehring Residence: Approved, but subject to continuing deadlines
The Board approved a single-family residence and related improvements near Kolekole Gulch in North Hilo in 2011. The owner later requested multiple extensions after encountering construction delays. The case shows that approval is possible, but it also shows how permit deadlines and conditions continue to affect the project after the initial decision.
Read the official Goehring time-extension record.
Silva Property: $85,000 fine and removal order
In 2024, the Board fined North Hilo property owners $85,000 for unauthorized expansion of a permitted residence and the placement of accessory structures. The Board also required removal of the unauthorized improvements.
Read more about the Silva enforcement case.
Gapp Property: A County-approved subdivision created a State problem
A Puna couple’s application to build was denied after OCCL determined that the parcel had been created through a subdivision that was not properly authorized under Conservation District rules. The owners had already spent heavily on the application process.
The case is a reminder that a County-approved subdivision does not necessarily resolve State Conservation District requirements.
Read more about the Gapp property.
South Kona Vacation Rental: Enforcement for prohibited use
A South Kona residence permitted within the Conservation District was later advertised and operated as a vacation rental. DLNR staff recommended fines and possible permit revocation because the original permit prohibited rental and commercial use.
Read more about the South Kona case.
What Buyers Should Verify Before Moving Forward
Before purchasing Conservation land with plans to build, you should verify:
- Whether the parcel is a legal lot of record
- The State Land Use District and Conservation Subzone
- Whether the entire parcel or only part of it is in Conservation
- Whether the proposed use is identified in that subzone
- The required OCCL approval or permit category
- Existing Conservation permits, conditions, and violations
- Legal and physical access
- Shoreline, flood, stream, slope, and erosion constraints
- Archaeological, cultural, and environmental issues
- Water, power, wastewater, and emergency access
- Realistic consultant, permitting, and construction costs
The purchase price is only one part of buying Conservation land. A low-priced parcel can become very expensive if the usable building area is limited or the approval process requires extensive professional work.
The Bottom Line
Building on Conservation land along the Hāmākua Coast is possible in the right circumstances. However, it requires patience, flexibility, professional planning, and a willingness to accept that the State may modify or deny the proposal.
The first question should not be, “Can I physically build a house here?” It should be, “Is my proposed use allowed on this specific legal parcel, in this specific subzone, and can I realistically obtain all of the required approvals?”
If you are considering a Conservation property in East Hawaiʻi, I can help you investigate the property, identify the questions that need to be answered, and coordinate the appropriate due diligence before you move forward. You can contact me here.
Reference Sources
- Hawaiʻi Administrative Rules, Title 13, Chapter 5
- OCCL applications and permit categories
- State Conservation District Subzones map
- Hawaiʻi County Special Management Area information
- Department of Health individual wastewater system information
- OCCL proposed Conservation District rule changes
Updated August 2026: OCCL is considering amendments to the Conservation District rules. The proposed amendments are not yet effective. Buyers and property owners should verify the current rules and application requirements directly with OCCL before relying on older reports or beginning a project.
If you would like the longer background report that this article was originally based on, you can download the full 13-page guide here. The guide was prepared in May 2025, so current requirements should always be confirmed with OCCL.